EV Chargers

Level 2 EV Charger Installation

Faster, Safer Charging at Home or Work

Charge faster at home or work. Our certified electricians install all major Level 2 EV chargers — Tesla Wall Connector, ChargePoint, JuiceBox, and universal J1772 — with permits and inspections handled end-to-end.

A typical home Level 2 install in Shreveport or Bossier City is a 240V, 40–60A dedicated circuit on its own breaker, sized to the charger and to whatever load headroom the existing panel still has. Before we quote the job we do a real load calculation under NEC Article 220 — not a guess based on panel size — because the biggest reason EV installs go sideways is a service that looked fine until you added a 48A continuous load on top of central AC, an electric dryer, and a heat-pump water heater. If the panel is tapped out, we'll quote the charger circuit alongside a 200A or 400A panel upgrade so you only take the disconnect once.

The actual install is normally a single-day job. We mount the charger (garage wall, outdoor weather-rated location, or carport), run the conduit and conductors back to the panel, set the breaker, bond and test, pull the permit, and meet the inspector. For Tesla Wall Connector we set the on-unit DIP-switch amperage to match the breaker and the wire size, and for networked units like ChargePoint Home Flex and Wallbox Pulsar we'll walk you through the app pairing before we leave.

On the commercial side we install workplace and fleet charging — multi-port pedestal and wall units, networked back-end for billing and access control, dedicated subpanels and step-down transformers where the service is 208V three-phase, and ongoing maintenance contracts for property managers who want a single number to call when a port goes offline.

Charging Solutions We Install

Home Charging

  • Site assessment & load calc
  • Permit & inspection
  • Panel upgrades if needed
  • Indoor or outdoor units

Commercial Charging

  • Multi-port installations
  • Workplace & fleet charging
  • Network setup & billing
  • Maintenance plans
Tesla · ChargePoint · JuiceBox · Wallbox · Enphase

EV charger installation in nearby cities

EV Charger Installation FAQ

How much does Level 2 EV charger installation cost in Shreveport?

Most Shreveport-area Level 2 installs run $700–$1,900 depending on panel capacity, wire run distance, and whether a dedicated 40–50A circuit and breaker are already in place. We provide a flat written quote before we start.

Do I need a panel upgrade to install a Level 2 EV charger?

Not always. Most 200A panels handle a 40A or 48A charger without an upgrade. Older 100A or 150A services usually need a load calculation and sometimes a sub-panel or full panel upgrade — we can bundle it into the same visit.

Which EV chargers do you install?

Tesla Wall Connector (including Universal J1772), ChargePoint Home Flex, Wallbox Pulsar Plus, Emporia, JuiceBox, Grizzl-E, and most other Level 2 hardwired and plug-in chargers.

Do you pull the electrical permit?

Yes — we pull the City of Shreveport or Bossier City permit, meet the inspector, and handle the SWEPCO paperwork where required. NEC 625 compliance included on every install.