Haughton Generators

Generator Installation in Haughton, LA

Ed's Electric installs whole-house standby generators across Haughton — Generac, Kohler, Briggs & Stratton — sized for your actual load, wired to a proper transfer switch, and permitted with Bossier Parish. Multi-day outages don't have to be normal.

  • Generac & Kohler standby installs
  • Automatic transfer switches
  • Natural gas & propane
  • Well-pump & HVAC sizing
  • Concrete/composite pad
  • Bossier Parish permits
  • Annual maintenance contracts
  • Portable inlet boxes

Standby generators for Haughton storm season

Haughton loses power to summer storms, hurricane remnants, and the occasional winter ice event. A properly sized standby generator starts within seconds of losing utility power, runs your AC, well pump, fridge, and lights automatically, and shuts off when SWEPCO is back. We size to your actual load — HVAC tonnage, well pump inrush, electric range/dryer — not a guess.

We install Generac, Kohler, Briggs & Stratton, and Champion. The install covers the pad, transfer switch, conduit, gas/propane coordination, Bossier Parish permit and inspection, start-up and load bank, and a walk-through of the maintenance schedule before we leave.

Ready to get started?

Call or text Ed's Electric — Shreveport's trusted licensed, bonded and insured electrician for 40+ years.

Haughton Generator FAQ

What size standby generator do most Haughton homes need?

Most Haughton homes run best on a 20kW to 26kW air-cooled standby. We size based on your AC tonnage, well pump, electric range/dryer, and which circuits you want covered — never a guess.

Can you install a generator on a rural Haughton property with propane?

Yes — propane is common on Haughton properties without natural gas service. We size the tank with your propane supplier, install the transfer switch and pad, and coordinate with Bossier Parish for the permit and inspection.

How long from signed quote to running generator?

Typical Haughton installs are 2–4 weeks: 1–2 days of electrical work, plus separate scheduling for the propane/gas line and the inspector.